A Detailed Project Development Book is one of the most important documents to assess the feasibility of project and to get financial closure. SOLARWIN with its sector expertise and established standing in the renewable energy consultancy not only gives the most exhaustive analysis of the project but also enjoys the confidence of industries, investors and banks alike.
- Site visit to analyze on ground conditions and relevant data collection including land available, soil stability, infrastructure required etc.
- Calculation of solar PV array capacity, electricity generation and system losses at the pre-identified site after studying land shape and area, solar irradiation and meteorological data.
- Detailed analysis and market scan of the available technology on the basis of access area availability and varied project requirements.
- Enlisting the design criteria for modules, inverters, switchgear, transformer, power evacuation, control & monitoring system and lightning protection & earthing system.
- Designing the complete system to minimize system losses, shading and dust effects.
- Preparation of single line diagrams and power evacuation plans.
- Analyzing the requirements for site levelling, equipment foundations, roads, trenches, compound wall, control room and switchyard in line with standards.
- Analyzing and enlisting of requirements of maintenance, spare parts, special tools, manpower training and operation manual.
- Drawing a detailed Implementation plan including execution strategy, project team and project execution schedule.
- Description of different risks viz technology, project completion, regulatory, plant performance and operating, financing and tariff risk.
The Bankable Project Book (BPB) Development year Why the Bankable Project Development Book (BPB)? Is so important for the Customer and Investors.
- BPB prepared and requested for funding companies and Banks.
- BPB makes the project Bankable
- The key for funding the project by Green Org.
- Funding companies require accurate data obtained from the feasibility study.
- Require accurate data for business plan, detailed design and project performance.
- BPB present multi disciplines design and the security “of pay back” to
FUNDING COMPANIES.
- The “Solar plats” investment is around 10 – 100 million USD
- Customer requires investing in the land cost and BPB.
- With the BPB, we can arrange credit for 10 years with soft interest rates (3-5%max) for the materials and equipment cost.
- For a loan or mortgage, the insurance companies will provide client the Surety bond rate of 1-2%
- Without the Bankable Project Development Book most of the projects fail due poor preparations and detailed design.
Funding Guarantee your project
- 100% LTV (security = Loan To Value means: Projected cash flow of full funding business plan)
- No personal guarantee
- No credit checks
- No loss of equity in your business
- No equity to bring in
- No collateral to deliver
- No delivery of company shares
- Quick turnaround time – often 60 - 90 days
- Flexible repayment terms (paying back earlier without penalty)
Bankable Project Development Book Actions
- Data gathering and complete project Due Diligence
- Complete project design
- Civil Engineering (client responsibility)
- Project Allocation
- Agriculture and type of vegetables and/or Herbs
- Feasibility study
- Business plan
- Financial analysis
- Detailed Project Reports
- Electrical Engineering
- Design the power station
- Procurements of all the equipment